Residents near the rising waters in the west main area of Bloomsburg have begun to evacuate. With another two to three inches of rain expected in the next 24 hours, the red cross has opened an emergency shelter in the Bloomsburg Elementary School. Check back soon for more updates on the flooding in Bloomsburg.
The Irondale Watertreatment plant becoming submerged in the rising waters.
Residents look on as the water floods the areas surrounding the Railroad st. bridge.
A Bloomsburg Police officer directs traffic after closing the lower end of West Main street.
10 minutes later the Railroad St. bridge is on its way to being closed.A stop sign hanging on, near the corner of W. 1st and Leonard st.